© 2018 White Raven Films

Technical Director

May 2, 2016

 

As technical director at White Raven Films, my job is to ensure that everything 'works' on a technical level.

 

At the beginning of a project, I will need to evaluate and specify any technical requirements that is needed. Sometimes this may mean having to test equipment on location for suitability. I will also need to make decisions on what requirements will be needed for cameras, microphones, software, archiving and so on.

 

Before each day’s shoot, I will need to test every piece of equipment, ensuring that all batteries are fully charged. I will also produce a full inventory list of equipment used for the day. When possible, I will also make contingency plans should a piece of equipment fail or not work as expected.

 

On conclusion of a day’s shoot, I will transfer the footage to a storage array, before transcoding and (if necessary) syncing to externally recorded audio. Since Bazz (artistic director) and I usually edit collaboratively, I will also make a second copy of the day’s footage on another media drive.

 

In future blogs I will discuss in detail our workflow and equipment used.

 

 

 

Please reload

Featured Posts

In the picture

September 28, 2016

1/7
Please reload

Recent Posts

January 15, 2017

September 28, 2016

May 24, 2016

May 13, 2016

Please reload

Search By Tags
Please reload

Follow Us
  • Facebook Classic
  • Twitter Classic